Yesterday, I had noticed they had framed incorrectly in the garage. The factory had messed up and gave materials for the new Landon layout in which the garage has a bump in for HVAC ducts, they switched to a single HVAC system with 2 zones instead of the 2 HVAC systems with 2 zones.
Since we signed before this change was made we will still get the 2 HVAC systems, as well, our project manager said that with the bonus room you get the 2 HVAC systems. So they will be fixing that blunder by cutting that section off and button up so it won't overhang into the garage.
I can imagine they will get more done on the second floor before they call it a day, but these are the pictures I took.
No comments:
Post a Comment