Counting down the days until we finally break ground....Here is a list of some of the selections we made in regards to structure and add-ons.   Also, remember to always save all your communications with Ryan Homes, you never know when they will try to pull a fast one.

Basement
  • 3 piece plumbing rough-in
  • Recessed lighting / HVAC package (16 lights and 7 HVAC vents)
  • Bathroom exhaust fan rough-in
  • 200A service
Garage
  • Floor drains
First Floor
  • Double patio door
  • Dining room windows
  • Level 2 cabinets
  • Upper corner cabinet to have glass door (non-standard)
  • Fireplace with granite surround
Second Floor
  • Bonus room
  • 2nd bathroom
  • Tray ceiling in master
  • Roman shower
  • Level 2 cabinets
  • Vanity height in upstairs bathrooms to match master bathrooms (non-standard)
  • Door from bedroom #3 to bathroom (non-standard, we didn't go with jack & jill)
Misc
  • Bronze fixtures throughout
  • Floodlight on back of house
  • Added 7 light rough-ins in all the bedrooms, great room and study
  • Added 1 extra outlet to garage
  • Scenic scape siding




Tuesday, June 16, 2015

The Lot

The lot is all staked out and ready to be excavated. They were supposed to break ground this week, but at our pre-construction meeting we noticed our plot plan did not show the front porch.  So now we are told they won't break ground until July 8th since they had to re-submit the plot-plan with the front porch and re-order the lumber.