Friday, August 28, 2015

Day 53: Electrical, Framing and more...

I visited the house around 12:30 today and to my surprise the whole house was wired already, must have only taken them like 4-5 hours.  Plumbers were leak testing the pipes and a crew was installing the fireplace.  Also the new framing crew was in there taking care of everything that was left by the other crew.  Things are really moving along today, which is what I like to see.

Looks like they had to move the location for the electric meter, which is fine by me as it put the electric panel in a location under the steps in the basement.