Took a mid day trip to the house to see what was going on.  Framers are back on site, but out to lunch, to fix/finish their doings.  We must have pulled the short straw on the framing crew because the house across the street was framed in a week.  HVAC guys were finishing up their stuff and should be done by end of the day.  Plumbers were doing their thing on the second floor.  Probably make a second trip out this evening to see where their progress ended.

Second trip: plumbers made some good progress on the second floor which looks to almost be complete.  HVAC guys have a short duct run to finish and hooking up gas lines.  Framers, not sure what they did, added the second post on the front porch is all I can tell, they really seem to be holding things up.


Finally framing in the tray ceiling.