Tuesday, August 11, 2015

Day 36: No work, Aerial Shots

Well another day where it doesn't seem like they did any work.  So my buddy brought his Phantom 3 over again and we took some sky shots.  It was nice to be able to see the upstairs since there aren't any steps, and it let us see if they made our master bedroom closets the same size, which they didn't, and if they added the door from the front right bedroom to the hall bathroom, which they also didn't.

There are a number of other things we noticed wrong and are keeping a list to see if they get resolved.

Hopefully tomorrow the roof goes on.  We are hoping to close beginning of October, but it seems less and less likely.





2 comments:

  1. We asked for the master bedroom to have the closets made the same size as well. I'm sure ours will be wrong as the PM we had the pre-con meeting with left and I didn't see him take any notes during the meeting. Nice thing is, it should be an easy fix to move that.

    ReplyDelete
    Replies
    1. Yeah should be an easy fix. But he said he marked it, plus I reminded him when framing started and he said it was well marked on drawing. Unfortunately I don't think the framing crew speaks or reads English.

      Delete