Monday, September 28, 2015

Day 84: nothing new

Doesn't seem like much is happening. Floor vent still hasn't been moved and rest of cabinets haven't been installed. Looks like tile for master bathroom was delivered, but looking at the boxes the floor tile is wrong. I'm waiting for them to actually get something right.  Hopefully something happens tomorrow, things are getting stale. 

1 comment:

  1. There are a few things not right with mine as well. During our Pre-con we asked where they plan to put the AC compressor and the PM confirmed it would be on the small side of our yard. This weekend I followed the copper pipe and they roughed in the wrong side of the house for the AC. This was a pretty big change for us and not sure why they did it considering we asked and they confirmed prior to building.

    I hope they can move it this week and put it where they said they would.

    The electrical guys also installed our panel partially in the opening of a doorway. The stairs had a rough opening for a door, but now we can't put a door there for the storage room since the panel is in the way. Not very bright.

    We also have a very loose copper pipe that they never attached to anything in the wall.