Today is the quality inspection. Over the past few days they've been going through their punch list and fixing any issues. They came and replaced the scratched hardwood and hopefully it stays scratch free this week. We are still waiting to hear back from rite rug as they are supposed to have some tile selections for us to pick from to trim around the window in our shower since their tiling crew screwed that up. Our pre-settlement walk-thru is this Wednesday with closing to follow Friday morning.
Monday, October 26, 2015
Wednesday, October 21, 2015
Day 107: Almost there
They are getting there, only a few more things left to do. Painters have been getting a lot done, just about everything has been painted now including the front door. Columns were painted so I guess they will be installed tomorrow. We got new steps in the garage too. A weeks worth of working days left before closing.
Monday, October 19, 2015
Day 105: Crunch time
With quality assurance check on Friday we are told the house is supposed to be 100% by then. Walking through today they have a lot of touching up to do. Some good news is that the island cabinets finally arrived correctly and were installed as well as the other cabinets that weren't hung yet.
The house is a bit of a mess now even though a cleaning crew was in last week. I noticed some scratches in the hardwood that I hope they plan on taking care of. Guess we will see how it goes and hope for the best.
An outlet they decided would go in our pantry cabinet and looks like they botched cutting it at first.
Wednesday, October 14, 2015
Day 100: Landscaping
Inside the house they are in fix mode. Outside we got our landscaping. They also leveled out the air conditioners. Won't have any updates until Sunday.
Tuesday, October 13, 2015
Day 98: Plumbers and more
Weekend Update: Gutters were installed
Yesterday (Monday) the plumbers came back and did all their finishing work. They were supposed to come last week but were behind in schedule. The downside to this was the carpets were installed and they were walking all over them shoes and all. I'm not sure why plastic was not put down, but I'm not happy at the fact that they weren't covered.
Also, the punch out crew has started to go through and fix blemishes on the walls and what not. They are still fixing the area around the refrigerator to make room for a cabinet and are still awaiting the rest of the cabinets. They have their quality assurance check on the 23rd with our pre-settlement walk-thru on the 28th and closing the 30th. Coming down to the wire now.
Yesterday (Monday) the plumbers came back and did all their finishing work. They were supposed to come last week but were behind in schedule. The downside to this was the carpets were installed and they were walking all over them shoes and all. I'm not sure why plastic was not put down, but I'm not happy at the fact that they weren't covered.
Also, the punch out crew has started to go through and fix blemishes on the walls and what not. They are still fixing the area around the refrigerator to make room for a cabinet and are still awaiting the rest of the cabinets. They have their quality assurance check on the 23rd with our pre-settlement walk-thru on the 28th and closing the 30th. Coming down to the wire now.
Cardboard blew back and no one thought to put it back down instead of walking on the hardwood.
Corner cabinet and one next to it need installed as well as island(on order).
Still need to finish out the cement board above the tile
Saturday, October 10, 2015
Day 95: HVAC returns and basement insulation.
On Friday the HVAC crew came back and finished hooking up furnaces and ac units. Although the ac units could use some leveling. The basement walls were insulated and all the doors were hung back up after being painted.
Thursday, October 8, 2015
Day 94: carpets and top soil
Today they installed all the carpet in the house and put down top soil on the yard. We met with out project manager to go issues we were finding and he assured us all would be fixed.
Wednesday, October 7, 2015
Day 93: Painters return
Painters returned today to paint all the doors and base boards. Apparently our carpet is getting installed tomorrow even though it seems the house isn't ready for it. Our cabinets that were messed up came in and well they messed up the island cabinets again. They started,living dirt around outside in preparation for final grading, maybe it will happen tomorrow too. Can't get much out of the project manager at this point and starting to get concerned.
Tuesday, October 6, 2015
Day 92: Replacing walls
Today they dry walled up the portion of the wall they ripped out yesterday. They were also blowing in insulation in the attic, caulking along base boards, installing glass shower door and appliances were delivered. Hopefully the rest of our cabinets that got messed up are delivered soon and they can finish that.
Monday, October 5, 2015
Day 91: Ripping out walls
Well it appears they are going to fix the framers mistake that prevented them from installing the 39" cabinet that goes above where the refrigerator will go. That is about all they did today.
Friday, October 2, 2015
Day 88: We have light....
Some good progress today...The sidewalk was poured this morning, the tile guys came back and grouted the master bathroom, and the electricians came and installed all the outlets and lighting. Still missing a few cabinets and a bedroom door.