Sunday, June 28, 2015

Waiting...

Counting down the days until we finally break ground....Here is a list of some of the selections we made in regards to structure and add-ons.   Also, remember to always save all your communications with Ryan Homes, you never know when they will try to pull a fast one.

Basement
  • 3 piece plumbing rough-in
  • Recessed lighting / HVAC package (16 lights and 7 HVAC vents)
  • Bathroom exhaust fan rough-in
  • 200A service
Garage
  • Floor drains
First Floor
  • Double patio door
  • Dining room windows
  • Level 2 cabinets
  • Upper corner cabinet to have glass door (non-standard)
  • Fireplace with granite surround
Second Floor
  • Bonus room
  • 2nd bathroom
  • Tray ceiling in master
  • Roman shower
  • Level 2 cabinets
  • Vanity height in upstairs bathrooms to match master bathrooms (non-standard)
  • Door from bedroom #3 to bathroom (non-standard, we didn't go with jack & jill)
Misc
  • Bronze fixtures throughout
  • Floodlight on back of house
  • Added 7 light rough-ins in all the bedrooms, great room and study
  • Added 1 extra outlet to garage
  • Scenic scape siding




No comments:

Post a Comment